I have two Manager files; one is always in use and updates structurally (if necessary) automatically when I update Manager on a regular basis.
The other I use for a event which operates on a cyclical basis (just 2 months a year). If Manager goes through a series of upgrades without me opening this file, will Manager always detect and upgrade as necessary, or is there a constraint (eg a time limit or a major software release level upgrade).
thanks.